SUPREME COURT OF INDIA

DIVISION BENCH

M/S. KOZYFLEX MATTRESSES PRIVATE LIMITED — Appellant

Vs.

SBI GENERAL INSURANCE COMPANY LIMITED AND ANOTHER — Respondent

( Before : B.R. Gavai and Sandeep Mehta, JJ. )

Civil Appeal No. 7966 of 2022

Decided on : 20-03-2024

“Fire Insurance Claim Revived: Manufacturer Gets Chance to Challenge Reports After Rejection”

Consumer Protection Act, 1986 – Section 2(1)(m) – The case involves a claim by against Respondent for indemnification of losses due to a fire at their manufacturing unit -Appellant argues that they were not given the opportunity to rebut the surveyor’s and investigators’ reports, which led to the rejection of their claim – Respondent contends that the claim was fraudulent and based on fabricated documents, and that Appellant is not a consumer under the Consumer Protection Act, 1986 – The Court found the preliminary objections regarding the maintainability of the complaint to be unsustainable and decided that Appellant should have been given an opportunity to rebut the reports – The Court analyzed the definition of ‘person’ under the Consumer Protection Act and concluded that a company can be considered a consumer – The Supreme Court set aside the order of the National Commission and remanded the matter for reconsideration, allowing Appellant to file a rebuttal.

Cases Referred

 

  • National Insurance Company v. Harsolia Motors and Ors., (2023) 8 SCC 362
  • Shrikant G. Mantri v. Punjab National Bank, (2022) 5 SCC 42

 

JUDGMENT

Sandeep Mehta, J. – This appeal under Section 67 of the Consumer Protection Act, 2019 (hereinafter being referred to as Act of 2019) has been preferred by the appellant herein for assailing final order dated 24th August, 2022 rendered by National Consumer Disputes Redressal Commission (hereinafter being referred to as National Commission), rejecting the Consumer Case No. 754 of 2015 filed by M/s. Kozyflex Mattresses Private Limited(hereinafter being referred to as the insured-appellant) praying for a direction to the SBI General Insurance Company(hereinafter being referred to as the insurer-respondent) to indemnify it for the loss caused by fire in the insured premises being the manufacturing unit of the insured-appellant company situated at Sy. No.-41-25, village Poosapatirega, Mandal and District Vizianagaram.

2. Brief facts essential for adjudication of the present civil appeal are noted hereinbelow.

3. The insured-appellant herein being a Private Limited Company registered under the Companies Act, 1956 is engaged in the business of manufacture and sale of coir foam mattresses, pillows, cushions and other coir by-products. The manufacturing unit of the insured-appellant is situated at Sy. No.-41-25, village Poosapatirega, Mandal and District Vizianagaram and was registered as a small scale industry with the District Industries Centre, Vizianagaram. The insured-appellant obtained a Standard Fire and Special Perils Policy(Material Damage) No.0000000000807725 (in short Policy) for the period commencing from 28th March, 2013 to 27th March, 2014 for a sum of Rs. 1.25 crores on the plant and machinery and a sum of Rs. 30,00,000/- on stock from the insurer-respondent. By an endorsement dated 29th March, 2013, the sum insured for stock was further enhanced to Rs. 1.55 crores and for building the sum insured was enhanced to Rs. 20,00,000/-.

4. It is claimed that a massive fire incident took place in the manufacturing unit of the insured-appellant in the intervening night of 13th/14th April, 2013. Immediate action by way of informing the police and the fire service station was taken and fire tenders were sent to the spot. The insured-appellant informed the insurer-respondent about the fire accident and the losses suffered in the manufacturing unit in the fire incident on 15th April, 2013. The insurer-respondent appointed Professional Surveyor & Loss Adjustor Pvt. Ltd., Secunderabad as the surveyor on 15th April, 2013. The surveyor inspected the factory premises on 16th April, 2013 and 17th April, 2013 and took photographs, videography and prepared inventory. The surveyor asked the insured-appellant to remove the collapsed roof from the manufacturing unit premises in order to conduct inspection of the machinery and stock and for carrying out the measurement and quantification. The collapsed roof was not found removed till the subsequent inspection conducted by the surveyor on 15th and 16th May, 2013. The third inspection was conducted between 15th and 17th July, 2014 and it is stated that by that time, the machineries in the manufacturing unit had been repaired. The insured-appellant submitted an insurance claim for a sum of Rs. 3.31 crores i.e. Rs.40,11,152/-for building, Rs.1,08,47,435/- for plant and machinery and Rs.1,87,72,489/- for stock.

5. The insurer-respondent appointed Mr. Kalahasti Satyanarayana, Dy.S.P. (Retd.), Insurance Claim Investigator, Guntur and Mr. K. Jagannadha Sastry, Advocate, Independent Investigator and Fact Finder, Vizianagaram to verify the documents submitted by the insured-appellant in support of his claim and to submit their independent reports. Mr. Kalahasti Satyanarayana submitted his inspection report dated 12th October, 2013 and Mr. K. Jagannadha Sastry submitted his inspection report dated 25th January, 2014 noting inter-alia that the purchase of machinery from M/s. Maheshwari Ribbons, Gudivada to the tune of Rs. 1,39,64,475/- and stock from Jageswari Enterprises to the tune of Rs. 64,39,810/- were mere paper and money transactions which have been done with the intention to siphon money from the State Bank of Hyderabad and the National Small Scale Industries Corporation Ltd. and that there had been no actual sale/purchase of such machinery and stock.

6. After examining all the documents submitted by the insuredappellant as well as the reports of the two investigators, the surveyor submitted a final survey report dated 11th February, 2014 observing that the claim was fraudulent and was based on fabricated documents and accordingly recommended for the repudiation of the claim. The Competent Authority of the insurerrespondent examined the entire material and repudiated the claim of the appellant by invoking Clause 8 of the General Terms and Conditions of Policy vide letter dated 3rd March, 2014.

7. The insured-appellant made a representation dated 11th January, 2015 to the Grievance Redressal Manager against the repudiation of its claim. However, such representation did not meet the desired result, upon which the insured-appellant filed Complaint No.329 of 2015 before the National Commission which was dismissed as withdrawn on 30th June, 2015 with the liberty to file a fresh complaint. Thereafter, the subject complaint came to be filed on 4th August, 2015 alleging deficiency in service on the part of the insurer-respondent. The insured-appellant contested the complaint by filing a detailed reply. The factum of obtaining the policy and the endorsement dated 29th March, 2013 made therein was not disputed. However, the insurer-respondent alleged that the loss had occurred within 16 days of obtaining the insurance policy and the claim was for a very heavy amount and thus, two independent investigators referred to supra were appointed to verify the veracity of the documents submitted by the insured-appellant in support of his claim and submit their independent reports. Both the investigators submitted their respective investigation reports wherein, the very factum of purchase of machinery and stock by the insured-appellant were found to be fabricated and mere paper transactions carried out with the intention to siphon money from the State Bank of Hyderabad and the National Small Scale Industries Corporation. The surveyor examined the reports of the investigators and submitted a final report dated 11th February, 2014 stating therein that the claim was fraudulent and based on fabricated documents and recommended repudiation of the claim. The Competent Authority of the insurer-respondent after examining the report of the surveyor repudiated the claim by letter dated 3rd March, 2014. It was further stated that the claim was repudiated as the same was fraudulent and exaggerated. The delay was attributable to the insured-appellant who did not cooperate with the surveyor and investigators who were not promptly provided with the requisite documents and clarifications. A preliminary objection was raised that the complaint involved complicated issues of fact which required examination of voluminous documentary evidence and cross-examination of witnesses and hence, it was prayed that the insured-appellant should be relegated to Civil Court for redressal of its grievances.

8. The insured-appellant filed its documentary evidence and the affidavit of evidence. The insurer-respondent also filed reports of the investigators, final survey report of the surveyor and affidavits of evidence of its authorized representatives. The National Commission, in its order referred to Clause-8 of General Terms and Conditions of Policy which reads as under: –

“8. If the claim be in any respect fraudulent, or in any false declaration be made or used in support thereof or any fraudulent means or devices are used by the Insured or any one acting on his behalf to obtain any benefit under the policy or if the loss or damage be occasioned by the wilful act, or with the connivance of the insured, all benefits under this policy shall be forfeited.”

9. After referring to the said clause and relying upon the reply of the insurer-respondent and the reports of the investigators and the surveyor, the National Commission proceeded to accept the same and upheld the repudiation letter dated 3rd March, 2014, rejecting the complaint vide order dated 24th August, 2022 which is assailed in the present appeal.

10. Learned counsel for the insured-appellant submitted that the queries raised by the investigators and surveyor were duly replied by the insured-appellant and the same forms part of the record before the National Commission. Neither the preliminary report nor the final report was provided to the insured-appellant and were directly produced along with the reply affidavit filed by the insurer-respondent before the National Commission and hence, there was no opportunity for the insured-appellant to rebut the same.

11. It was further submitted that the stock as well as the machinery destroyed in the fire were purchased through properly accounted transactions which are clearly reflected in the account books of the insured-appellant. All these accounts were produced by the insured-appellant before the surveyor and investigators and thus, the reports of the surveyor and investigators are partisan and unacceptable. The veracity of the surveyors report is questioned on the ground that the same is contradicted by the investigators reports. Learned counsel thus prayed that it is a fit matter warranting remand of the complaint to the National Commission for reconsideration after giving an opportunity to the insured-appellant to rebut the investigation reports and the surveyor report filed on behalf of the insurer-respondent.

12. Per contra, learned counsel representing the insurer-respondent vehemently and fervently contended that the insured-appellant being a body corporate is not a consumer within the meaning of Section 2(1)(m) of the Consumer Protection Act, 1986 (hereinafter referred to as Act of 1986) as it would not be covered by the definition of consumer provided under the Act of 1986. He contended that the definition of person has been amended vide Consumer Protection Act, 2019 wherein, the word company has been included and hence, it has to be presumed that company or body corporate was not covered under the definition of a person under the Act of 1986. In this regard, he placed reliance on the judgments rendered by this Court in the cases of Shrikant G. Mantri v. Punjab National Bank, (2022) 5 SCC 42 and National Insurance Company v. Harsolia Motors and Ors., (2023) 8 SCC 362 and urged that the insured-appellant having taken the insurance policy for commercial purposes is not entitled to invoke the jurisdiction of forums established under the Consumer Protection Act. On these grounds, learned counsel implored the Court to dismiss the appeal.

13. We have given our thoughtful consideration to the submissions advanced at bar and have gone through the material placed on record.

14. We proceed to deal with the preliminary objections raised by the learned counsel for the respondent regarding maintainability of the complaint before the National Commission. The objections are twofold:

(1) That the word company is not covered within the definition of person under Section 2(1)(m) of the Consumer Protection Act, 1986.

(2) That the insured-appellant having taken the policy for commercial purposes cannot invoke the jurisdiction of the National Commission because the transactions leading to filing of the complaint cannot be termed to be lack of service/deficiency in service.

15. We may at the outset record that the definition of person as provided in the Act of 1986 is inclusive and not exhaustive. Consumer Protection Act being a beneficial legislation, a liberal interpretation has to be given to the statute. The very fact that in the Act of 2019, a body corporate has been brought within the definition of person, by itself indicates that the legislature realized the incongruity in the unamended provision and has rectified the anomaly by including the word company in the definition of person. Hence, the first preliminary objection raised by learned counsel for the respondent regarding company not being covered by the definition of person under Act of 1986 has no legs to stand and deserves to be rejected.

16. The second preliminary objection raised by the respondent was regarding claim being filed for a commercial purpose. We have given our thoughtful consideration to the said submission and find that the judgments relied upon by learned counsel for the respondent in the cases of Shrikant G. Mantri (supra) and Harsolia Motors (supra) are totally distinguishable as the same deal with the situation wherein, the insurance policy was taken for a commercial purpose plain and simple. The situation in the case at hand is entirely different. The insurance policy in the present case was taken under the title Standard Fire and Special Perils Policy(Material Damage) and was covering the risk of these elements only and nothing else. The claim was also filed for indemnifying the insured-appellant for the damage caused in a fire accident at the insured premises. Hence, this Court has no hesitation in holding that both the preliminary objections raised by the learned counsel for the respondent are unsustainable. Having held so, we now come to the merits of the matter.

17. The insured-appellant has taken a pertinent plea in the instant civil appeal that the copies of the surveyors report and the investigators report were not provided timely and thus, the insured-appellant did not get proper opportunity to rebut the same. This pertinent plea taken by the insured-appellant in the memo of appeal has not been specifically refuted and only a formal denial was offered in the counter-affidavit filed by the insurer-respondent.

18. In this background, we feel that ends of justice require that the insured-appellant should have been provided proper opportunity to file its rebuttal/objections to the affidavit/reports submitted by the insurer-respondent before the National Commission and consequently, the complaint should be reconsidered on merits after providing such opportunity to the appellant.

19. As a result of the above discussion, it is hereby directed that the appellant shall be permitted to file its rebuttal/rejoinder affidavit before the National Commission limited to the contents of the reports referred to supra. Thereafter, the matter shall be reheard and decided on merits afresh.

20. Resultantly, the impugned order dated 24th August, 2022 is set aside. The matter is remitted to the National Commission for considering and deciding the complaint afresh in light of the above directions. However, we make it clear that none of the observations made hereinabove shall prejudice the decision of the consumer case on remand.

21. The appeal is disposed of accordingly.

22. Pending application(s), if any, shall stand disposed of.

By sclaw

Leave a Reply

You missed

EVM and VVPAT – Reliability – The petitioners challenged the reliability of Electronic Voting Machines (EVMs) and Voter Verifiable Paper Audit Trail (VVPAT) systems, suspecting potential manipulation and demanding transparency in the voting process – The core issues revolved around the integrity of EVMs, the adequacy of VVPAT verification, and the fundamental right of voters to know their votes are correctly recorded and counted – Petitioner argued for a return to paper ballots, provision of VVPAT slips to voters, or 100% counting of VVPAT slips alongside electronic counts, citing concerns over EVM transparency and voter confidence – The Election Commission of India (ECI) defended the EVMs’ success in ensuring free, fair, and transparent elections, highlighting technological safeguards against tampering and the benefits over paper ballots – The Court upheld the current EVM and VVPAT system, dismissing the petitions and suggesting improvements for transparency without disrupting the ongoing electoral process – The Court relied on past precedents, the ECI’s robust procedures, and the absence of cogent material evidence against EVMs to reject the petitions – The judgment referenced constitutional provisions, electoral laws, and previous rulings to support the ECI’s position and the current electoral practices – The Supreme Court concluded that the EVMs and VVPAT systems are reliable, and the petitions were dismissed based on the lack of substantial evidence against the current electoral process.